Scheduling in a changing world: Maximizing throughput with time-varying capacity
The post presents scheduling algorithms for non-preemptive jobs when cloud capacity changes over time because of failures, maintenance, power limits, or higher-priority workloads. The goal is to maximize completed job value while respecting release times, deadlines, processing durations, and fluctuating parallel capacity. The research establishes the first constant-factor guarantees for several offline and online variants, including a 1/11 competitive ratio for a demanding common-deadline model.
Scheduling with Time-Varying Capacity
- A capacity profile specifies how many jobs can run simultaneously at each point in time.
- Each job has:
- A release time
- A hard deadline
- A processing duration
- A weight or profit
- Jobs must run continuously once started in the non-preemptive setting.
- If capacity drops during execution, an interrupted job loses its progress.
- The objective is to select and schedule jobs maximizing total completed weight.
- The study considers:
- Offline scheduling, where future jobs and capacity changes are known.
- Online scheduling, where jobs arrive dynamically and decisions cannot be reversed.
Offline Scheduling Results
- The optimal problem is NP-hard, so the work focuses on approximation guarantees.
- For unit-profit jobs, an earliest-finish-time Greedy algorithm achieves a 1/2-approximation.
- It completes at least half as many jobs as an optimal schedule.
- This matches the classic guarantee for single-capacity scheduling.
- For jobs with different weights, a primal-dual algorithm achieves a 1/4-approximation.
Why Online Non-Preemptive Scheduling Is Difficult
- Online schedulers must commit without knowing future jobs.
- Starting a long job can block many shorter jobs that arrive later.
- Because each completed job may have equal value regardless of duration, one poor decision can sharply reduce throughput.
- Consequently, standard non-preemptive online algorithms have competitive ratios approaching zero.
Interruption with Restarts
- An active job may be interrupted, but its completed work is discarded and the job can be retried later.
- A modified earliest-finish-time Greedy algorithm achieves a 1/2 competitive ratio.
- This means it can guarantee at least half the throughput of an optimal schedule with complete knowledge of future arrivals.
Interruption Without Restarts
- If an interrupted job is permanently discarded, online scheduling becomes substantially harder.
- In general, every online algorithm can be forced into decisions that prevent it from completing much future work.
- The competitive ratio again approaches zero.
- The authors therefore study a practical special case in which all jobs share a common deadline.
A Common-Deadline Algorithm
For a unit-capacity system, the algorithm maintains a tentative schedule of jobs in disjoint time intervals. When a new job arrives, it applies the first suitable action:
- Place the job in an empty interval.
- Replace a scheduled future job if the new job is significantly shorter.
- Interrupt the current job if the new job is shorter than its remaining processing time.
- Discard the new job.
- The approach balances immediate execution against preserving capacity for shorter future jobs.
- A generalized version works with arbitrary capacity profiles.
- The resulting algorithm achieves the first constant competitive guarantee for this setting: 1/11.
The results suggest that schedulers for volatile cloud environments need controlled interruption and carefully designed replacement policies. Allowing restarts offers strong guarantees, while stricter interruption rules require additional structure—such as a shared deadline—to achieve predictable performance.